The Times Herald interviewed Sal Ali from PennDOT and found out the target reopening date for the bridge on Plymouth Road in Plymouth Meeting. According to Ali, the bridge and road should reopen on August 31st.
From the Times Herald:
“Aug. 31 is the plan,” said Sal Ali, the assistant construction engineer for PennDOT District 6. “They are planning to pave the roadway approaches to the bridge on both sides next week, paint the pavement markings on the roadway and install the guide rails on both sides of the bridge.”
Click here to read the full story.